Our Practical Completion Inspection has now been booked in for Wed, 6 Feb 2013.
We have decided to get an independent inspection completed before then, as they would know all the things that should be checked that we might miss. No complaints about the work completed by Wisdom, we are very happy so far. We just need an expert set of eyes to check everything for us.
Meanwhile, DH had a meeting with Wisdom landscapes about our concrete side path, as some adjustments need to be made to the initial plan that was quoted last year. So the driveway and path will now be completed early next week, subject to the weather.
Subscribe to:
Post Comments (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)
No comments:
Post a Comment