This week the house has been sitting idle. Internal plumbing was completed, but the outside gas outlet was installed on the wrong side of the alfresco. A call to the SS and this was promptly fixed at the end of the week.
Bricks have been delivered, but the brickies are still working on another job so now we wait. Hoepfully they will start soon.
Subscribe to:
Post Comments (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)
No comments:
Post a Comment