Received notice that the council approved DA has indicated the block could have salinity issues. This would mean we need to upgrade the slab, have extra piering and upgrade the bricks to exposure grade.
We can get an independed report done to check this. Not sure how much this would cost but I would imagine a fair amount. The report could then come back and confirm salinity and we would need to upgrade the slab etc anyway. Or do we just do the upgrade without the report? Either way, it means more money spent. Haven't started the build yet and already extra costs.
Not happy to hear we needed to change the bricks to exposure grade, as we spent such a long time looking and deciding, then deciding on external colours. Wasn't too keen to go through the whole proccess again. So did a little surfing around the internet and found the product data sheet for the Austral Symmetry Asphalt bricks. Guess what? They are classed as "exposure grade". Thank goodness for that.
We were hoping the build would start mid June. If we decide to get the report first, I am sure that will delay the start of our build. Or do we just go ahead with the upgrade? CSO was not in on Friday, so hopefully we'll know some more details on Monday.
Showing posts with label Salinity. Show all posts
Showing posts with label Salinity. Show all posts
Saturday, 2 June 2012
Subscribe to:
Posts (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)