Last week the lower ground eves were completed. Then the airconditioning ducting and electrical wiring was done as well.
Showing posts with label Eves. Show all posts
Showing posts with label Eves. Show all posts
Monday, 26 November 2012
Saturday, 3 November 2012
2nd floor eves done and bricks cleaned
A bit quieter on site this week. The 2nd floor bricks were cleaned on Monday, very happy how they look. The majority of brick work looks great but we did find one large chip in a brick on the balcony, so hopefully they can fix this.
Later in the week the 2nd floor eves were done and today the painters were there. It did rain around 12pm for about an hour so they must have managed to get it all done.
Next week they will remove the scafolding and complete the 1st floor roof and eves.
Later in the week the 2nd floor eves were done and today the painters were there. It did rain around 12pm for about an hour so they must have managed to get it all done.
Next week they will remove the scafolding and complete the 1st floor roof and eves.
Front balcony
Second bedroom window
Master suite window. Broken glass will be replaced once scafolding is removed.
Chip in the brick on the balcony
Subscribe to:
Posts (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)