Drove by the block today and found the external plumbing was completed yesterday.
Plus we now have a big pile of dirt at the back of the house and the front. Hmmm, not sure if we can utilise that for fill. I'm sure there will be growing pile of something as the build progresses.
Our SS contacted us late last week, after external plumbing, the next item on the list to be completed is the frame.
Showing posts with label Plumbing. Show all posts
Showing posts with label Plumbing. Show all posts
Tuesday, 11 September 2012
Friday, 31 August 2012
Piering & Plumbing done
Another step forward this week.
Yesterday the piering was completed and today the plumbing. So hopefully that means the slab might happen next week.
Yesterday the piering was completed and today the plumbing. So hopefully that means the slab might happen next week.
Subscribe to:
Posts (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)