Showing posts with label Piering. Show all posts
Showing posts with label Piering. Show all posts

Friday, 31 August 2012

Piering & Plumbing done

Another step forward this week.
Yesterday the piering was completed and today the plumbing. So hopefully that means the slab might happen next week.





Labels

Air conditioning (1) Bathroom (5) Bricks (7) Carpet (2) Cornice (1) Doors (3) Driveway (2) Electricals (1) Eves (2) External colours (1) Facia (1) Formwork (1) Frame (2) Garage door (1) Guttering (1) Gyprock (2) Hallway (1) Home theatre (2) House plans (1) Internal Colours (1) Kitchen (8) Laundry (3) Laundry landing (1) Letterbox (1) Lights (2) Pantry (1) Pavers (1) Piering (1) Plumbing (2) Pool (7) Roof (2) Salinity (1) Screen door (1) Shower screens (1) Shutters (2) Site cut (1) Slab (1) Stairs (5) Steps (1) Taps (1) Tiles (5) Tiling (3) Water tank (1) windows (1) WIR (1)