Well the house plans have been revised to raise the slab by 200mm. There will now be four steps to the front porch and a landing and step for the laundry door on the side of the house. Good news is the back of the block will now be nearly level to the back of the house, so we may not need any retaining walls there. Not sure about the side yet, we'll look at that once the house slab has been laid.
While we wait for our house construction plans and construction certificate, the pool builder is ready to start construction. Pool peg out has been completed and the pool works scheduled to commence on Tuesday and weather permitting, concreting the following week.
Photo of the pool pegout from the backyard.........the house in the background is another Wisdom Majestic.
Saturday, 7 July 2012
Subscribe to:
Post Comments (Atom)
Labels
Air conditioning
(1)
Bathroom
(5)
Bricks
(7)
Carpet
(2)
Cornice
(1)
Doors
(3)
Driveway
(2)
Electricals
(1)
Eves
(2)
External colours
(1)
Facia
(1)
Formwork
(1)
Frame
(2)
Garage door
(1)
Guttering
(1)
Gyprock
(2)
Hallway
(1)
Home theatre
(2)
House plans
(1)
Internal Colours
(1)
Kitchen
(8)
Laundry
(3)
Laundry landing
(1)
Letterbox
(1)
Lights
(2)
Pantry
(1)
Pavers
(1)
Piering
(1)
Plumbing
(2)
Pool
(7)
Roof
(2)
Salinity
(1)
Screen door
(1)
Shower screens
(1)
Shutters
(2)
Site cut
(1)
Slab
(1)
Stairs
(5)
Steps
(1)
Taps
(1)
Tiles
(5)
Tiling
(3)
Water tank
(1)
windows
(1)
WIR
(1)
No comments:
Post a Comment